Diamond Light Source - Annual Review 2022/23

Key Facts and Figures Proposals by discipline and research theme Experimental shifts scheduled by Diamond by main subject area for 2022/23 0.00 500.00 1,000.00 1,500.00 2,000.00 B24 eBIC B21 B22 I22 B23 DL-SAXS I03 I04 I04-1 I23 I24 Xchem I11 I15 I15-1 I19 I06 I10 I16 I21 I05 B07 I07 I09 B18 I18 I20-Scanning I20-EDE ePSIC I08 I08-1 DIAD I12 I13-1 I13-2 I14 B16* 0.0 2,000.0 4,000.0 6,000.0 8,000.0 10,000.0 12,000.0 14,000.0 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 5,000.00 10,000.00 15,000.00 20,000.00 25,000.00 30,000.00 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 Journal Papers in the Diamond Publications Database Proteins Deposited in the PDB Other items in the Diamond Publications Database (conference papers, book chapters, etc.) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023(April) Cumulative number of items in Diamond Publications Database by our scientists and users and cumulative number of protein structures solved None Archaeological and Cultural Heritage Biology and Bio-materials Chemistry Earth Science Energy Engineering Environment Food Science Information and Communication Technology Materials Medicine Physics Technique Development Facility usage In our sixteenth year of operations (1st April 2022 to 31st March 2023), we received 1,906 proposals for experiments on our instruments via peer reviewed access routes, requesting a total of 24,252 shifts. After peer review, 1,420 proposals were awarded beamtime. This resulted in 16,478 experimental shifts being awarded across 33 beamlines and seven electron microscopes delivering time to academic users. We welcomed 5,279 onsite user visits from academia across all instruments, with an additional 3,914 remote user visits. The machine continues to perform to the highest standard with 97.3%uptime and 112 hours mean time between failures (MTBF). 6% 2% 16% 2% 13% 2% 0% 33.75% 5% 2% 17% 2% 0% 6 7 D I A M O N D L I G H T S O U R C E A N N U A L R E V I E W 2 0 2 2 / 2 3 D I A M O N D L I G H T S O U R C E A N N U A L R E V I E W 2 0 2 2 / 2 3 Machine performance 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 Total no. operational beamlines by end FY 19 20 22 24 25 26 28 31 32 32 33 33 33 Scheduled hours of machine operation 5808 6000 5832 5976 5808 5928 5688 6072 5904 5913 4345* 5396 6009 Scheduled hours of user operation 4728 5064 4872 5088 4944 5040 4584 5160 4992 4992 3445* 4532 5145 Machine uptime % 97.5 97.7 98.3 98.2 97.6 97.6 98.7 98.2 98.4 98.1 96.2 97.4 97.3 Mean time between failures (hours) 28.5 55.4 52.4 60.3 38.6 119.4 103.1 79.9 90.3 104.7 132 110 112 * hours reduced due to COVID * Not all proposals are attached to a science area. This explains the difference in Delivered shifts (+233 have no Science Area in the same access route and instruments) User shifts requested, awarded and delivered by group, beamline and electronmicroscope 2021/22 3,000.00 0.00 500.00 1,000.00 1,500.00 2,000.00 2,500.00 B24 eBIC B21 B22 I22 B23 DL-SAXS I03 I04 I04-1 I23 I24 Xchem I11 I15 I15-1 I19 I06 I10 I16 I21 I05 B07 I07 I09 B18 I18 I20-Scanning I20-EDE ePSIC I08 I08-1 DIAD I12 I13-1 I13-2 I14 B16* 0.0 2,000.0 4,000.0 6,000.0 8,000.0 10,000.0 12,000.0 14,000.0 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 5,000.00 10,000.00 15,000.00 20,000.00 25,000.00 30,000.00 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2017 2018 2019 2020 2021 2022 2023(April) Soft Condensed Matter Group Macromolecular Crystallography Group Magnetic Materials Group Stuctures and Surfaces Group Biological Cryo- Imaging Group Crystallography Group Spectroscopy Group Imaging and Microscopy Group ■ Requested ■ Awarded ■ Delivered * B16 is the Test beamline, with 50% of beamtime for users. The rest is used for in-house developments for all beamlines. 3,000.0 0.00 500.00 1,000.00 1,500.00 2,000.00 2,500.00 B24 eBIC B21 B22 I22 B23 DL-SAXS I03 I04 I04-1 I23 I24 Xchem I11 I15 I15-1 I19 I06 I10 I16 I21 I05 B07 I07 I09 B18 I18 I20-Scanning I20-EDE ePSIC I08 I08-1 DIAD I12 I13-1 I13-2 I14 B16* 0.0 2,000.0 4,000.0 6,000.0 8,000.0 10,000.0 12,000.0 14,000.0 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 5,000.00 10,000.00 15,000.00 20,000.00 2 30, 0. 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2021 2022 2023(April) Total user shifts requested, awarded and delivered ■ Requested ■ Awarded ■ Delivered ■ Individual remote user visits ■ Proposals awarded ■ Proposals submitted ■ Individual on-site user visits Total numbers of proposals and users per year 3,00 . 0 0. 0 500. 0 1,00 . 0 1,500.00 2,000.00 2,500. 0 B24 eBIC B21 B22 I22 B23 DL-SAXS I03 I04 I04-1 I23 I24 Xchem I11 I15 I15-1 I19 I06 I10 I16 I21 I05 B07 I07 I09 B18 I18 I20-Scanning I20-EDE ePSIC I08 I08-1 DIAD I12 I13-1 I13-2 I14 B16* 0. 2,00 . 4,00 . 6,00 . 8,00 . 10, 0 . 12,00 . 14,00 . 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 5,00 . 0 10,000.00 15,000. 0 20, 0 . 0 25,00 . 0 30, 0 . 0 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2021 2022 20 3(April) * Staff visits are now included for academic access routes, in-house research is still excluded * also includes shifts requested awarded and delivered on labs and offline facilities

RkJQdWJsaXNoZXIy OTk3MjMx